G.J. Gardner — ERP for a $1.7B Franchise Network

G.J. Gardner — ERP for a $1.7B Franchise Network

Timeline

2016 – 2019

My Role

Principal Product Designer

Impact

ERP for a $1.7B+ network · 150+ locations · 5 countries · new company-wide pre-sales standard

Spreadsheets held a $1.7B network together. Someone had to replace them without breaking it.

Challenge

A construction franchise network turning over $1.7B+ a year ran on manual spreadsheets. 150+ offices across 5 countries, 2,900+ custom homes built annually — every quote, schedule and supplier order living in files passed between people. The obvious answer was a cloud ERP. The hard part was who would use it: franchise operators who build houses for a living, not software users. Many had run their office the same way for a decade and had no reason to trust a system that made their work more visible. Softeq won the tender on a multi-million-dollar contract, and the client's Product Owner asked for me on the project by name. For three years I was the only designer on it, working alongside three business analysts — which meant every workflow decision, every screen and every argument about scope came through one person.

Construction planning with architectural drawings

MY ACTIONS

1. Mapped the real workflows before designing anything. I worked through how a franchise office actually operates — where a quote begins, who signs off, what happens when a supplier is late. The business analysts held the process knowledge; my job was turning it into an information architecture that survived contact with 150+ offices that each did things slightly differently. 2. Separated what must be global from what can stay local. The network needed consistency for reporting and franchise-wide control, but every office had local practices worth keeping. I classified each workflow step as either a fixed constraint or a configurable parameter — the decision that made one system work across 5 countries without forcing everyone into an identical process. 3. Designed for people who don't use software all day. Dense construction data — schedules, variations, supplier orders, cost tracking — presented so a builder could act on it without training. Progressive disclosure over feature-complete screens. 4. Invented Pre-Contract Interactive Prototyping. Instead of selling enterprise projects with slides, I built live interactive prototypes used inside sales conversations, so clients could click through the product before signing. It shortened the distance between "we think you need this" and a signed contract — and Softeq adopted it company-wide as a pre-sales standard.

Solution

A cloud ERP that replaced spreadsheet operations across a $1.7B+ network — 150+ locations, 5 countries, 2,900+ homes a year. The pre-sales prototyping method outlived the project: it became a company-wide standard at Softeq and was used on later enterprise deals.

What I'd Do Differently

Three years as the sole designer on a system this size was too long to stay solo. I held the whole model in my head, which made me fast and made the project fragile — onboarding anyone new meant transferring years of undocumented decisions. I should have pushed to build a second designer into the project by year two, not because the workload demanded it, but because a system that only one person understands is a risk to the client, not just to me.

©2026 dima trubnikov |

d.trubnikov@me.com |

+370 697 44 243 |

Vilnius, lithuania (eu)

©2026 dima trubnikov |

d.trubnikov@me.com |

+370 697 44 243 |

Vilnius, lithuania (eu)

©2026 dima trubnikoV

d.trubnikov@me.com

+370 697 44 243